What this plant actually is
This is the plant most commercial mills actually buy. Three models cover 20, 25 and 30 tonnes per day; the flow sheet graduates from 3B2M with a single twin-bin sifter to 4B4M with two. All three are delivered with a cleaning flow diagram and a milling flow diagram engraved into the documentation pack.
6FTDP-20 / 25 / 30 all share spares and roll housings
Full cleaning section: vibrating screen, destoner, scourers, washer-destoner
Floor-mounted plansifters — no tower required up to 30 t/d
6FGP patented mill bodies: lower energy per tonne
Standard models and parameters
All figures are nominal at 380 V / 50 Hz with wheat at 12.5% incoming moisture and 76% extraction. Deviations of ±8% are normal and depend on wheat hardness, roll condition and operator settings.
| Model | Capacity | Power / consumption | Weight / footprint | Configuration |
|---|---|---|---|---|
| 6FTDP-20 | 20 t/d | 51 kW | — 12 × 5 × 4 m | 6F2240/5 mills, 1 twin-bin sifter, 3B2M |
| 6FTDP-25 | 25 t/d | 67 kW | 9,000 kg 15 × 5 × 4 m | 6F2240/6 mills, 2 twin-bin sifters, 3B3M |
| 6FTDP-30 | 30 t/d | 92 kW | — 18 × 6 × 6.5 m | 1830/10 mills, 2 twin-bin sifters, 4B4M |
Process flow
- 1 Intake & pre-cleaning
- 2 Vibrating screen
- 3 Gravity destoner
- 4 Two scourers
- 5 Washing destoner
- 6 Tempering 12–24 h
- 7 4B4M milling
- 8 Two twin-bin plansifters
- 9 Packing
How to select
Take the 30 t/d over the 25 t/d if you expect to grow: the marginal cost of the extra 4B passage is small compared with the cost of a second plant later. Take the 25 t/d if your building is fixed and 15 m is your maximum bay length.
Typical applications
- Regional flour brands
- Bakery supply contracts
- Noodle and steamed-bread flour
- Xinjiang-style granular flour (6FGP)
From the brochure
6FTDP 20–30 t/d Flour Plant
Photographs and parameter panels reproduced from the 2026 wheat milling catalogue. Dimension drawings and equipment lists are the original manufacturer figures.
Answers
Frequently asked questions
Straight answers to the questions engineers and mill owners actually ask us during plant sizing. If your case is not covered, send the wheat specification and your target tonnage.
Ask an engineer →- What is the difference between 3B3M and 4B4M?
- One additional break and one additional reduction passage each. 4B4M gives you a cleaner separation of patent, middle and clear flour streams, and typically 1.5–2 points more patent extraction.
- How long is commissioning?
- 12–18 days on site for a 20–30 t/d plant, including steel erection, alignment, dry running, load testing and operator training.
- Can it produce Atta and Maida?
- Yes. The 6FTDP flow sheet with a purifier and a suitable screen stack produces both chakki-style Atta and 76% extraction Maida for South Asian markets.
Continue
Next: 6FTDP 40–60 t/d Flour Plant
Purifier, bran finisher and three simultaneous flour grades. — 40–60 t/d
View 6FTDP 40–60 t/d Flour Plant →Next step
Send your tonnage. Get a flow sheet in 12 working hours.
Send us: daily capacity target, wheat type and quality, available building dimensions, and local power supply. We reply within 12 working hours with a preliminary flow sheet, equipment list and budget range — no obligation.